ExamSimul
  • Certifications
    • Agile
    • Agile Scrum
    • Business Continuity
    • CyberSecurity
      • ISO 27001
      • NIST
    • Design Thinking
    • DevOps
    • Enterprise Architecture
    • Governance System
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • Project Management
      • AgilePM
      • PM2
      • PRINCE2
      • PRINCE2 Agile
    • Service Management
      • FitSM
      • ISO 20000
      • ITIL
        • ITIL Foundation
        • ITIL Managing Professional
        • ITIL Strategic Leader
        • ITIL Practitioner
      • OpenSM
    • SW Testing
  • Exams
    • AgilePM®
    • Agile Scrum Product Owner®
    • Agile Scrum Master®
    • Design Thinking®
    • DevOps®
    • DORA Resilience
      • DORA Foundation
    • Enterprise Architecture
      • Exam Simulator for TOGAF® EA Foundation
    • FitSM®
    • ISO 20000
      • ISO 20k Foundation
      • ISO 20k Auditor
    • ISO 22301 Continuity
    • ISO 27001
      • ISO 27001 Foundation
      • ISO 27001 Auditor
      • ISO 27001 Lead Auditor
      • ISO 27701 Foundation
    • ISO 31000 Risk Mgmt
    • IT Governance
    • ITIL®
      • ITIL® Foundation
      • ITIL® Managing Professional
      • ITIL® Strategic Leader
      • ITIL® Practitioner
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • NIS 2 Cybersecurity
      • NIS 2 Foundation
    • NIST Privacy
      • NIST Privacy Foundation
    • OpenSM™
      • OpenSM Foundation
    • PM2®
      • PM2 Foundation
    • PRINCE2®
      • PRINCE2® Foundation
      • PRINCE2® Practitioner
    • PRINCE2® Agile
    • SW Testing
  • Courses
    • AgilePM
      • AgilePM® Foundation
      • AgilePM® Practitioner
    • Agile Scrum
      • Agile Scrum Master
    • Cloud Management
    • Design Thinking
      • DT Method® Foundation
    • DORA Cybersecurity
    • FitSM
      • FitSM Foundation
    • ISO/IEC 20000
      • ISO 20000 Foundation
      • ISO 20000 Auditor
      • ISO 20000 Practitioner
      • ISO 20000 Lead Auditor
    • ISO 22301 Continuity
      • ISO 22301 Foundation
    • ISO/IEC 27000
      • ISO 27001 Foundation
      • ISO 27001 Auditor
      • ISO 27001 Practitioner
      • ISO 27001 Lead Auditor
      • ISO 27032 Foundation
      • ISO 27035 Foundation
    • ISO 31000 Risk Mgmt
      • ISO 31000 Foundation
    • ITIL® 4
      • ITIL® 4 Foundation
      • ITIL® 4 Managing Professional
        • ITIL® 4 CDS
        • ITIL® 4 DSV
        • ITIL® 4 HVIT
        • ITIL® 4 DPI
      • ITIL® 4 Strategic Leader
        • ITIL® 4 DPI
        • ITIL® 4 DITS
      • ITIL® 4 Practitioner
        • ITIL® 4 Monitoring and Event Management
        • ITIL® 4 Incident Management
        • ITIL® 4 Problem Management
        • ITIL® 4 Service Desk
        • ITIL® 4 Service Request Management
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • NIS 2 Cybersecurity
    • OpenSM
      • OpenSM Foundation
    • PM2 EU Project
      • PM2® Foundation
    • PRINCE2®
      • PRINCE2® Foundation
      • PRINCE2® Practitioner
    • PRINCE2 Agile®
      • PRINCE2 Agile® Foundation
      • PRINCE2 Agile® Practitioner
    • Privacy
      • ISO 27701 Privacy Foundation
      • NIST Privacy Foundation
    • SW Testing
      • SW Testing Foundation
    • TOGAF®
      • TOGAF® EA Foundation
      • TOGAF® EA Practitioner
  • Resources
    • Academy
    • Examination Institute
      • APMG
      • Axelos
        • CPD Requirements
      • EXIN
      • GoToCertify
      • ISACA
      • PECB
      • Peoplecert
        • How to access eBook
        • How to book an Exam
        • How to renew ITIL certification
      • PMI
        • PDU to maintain PMI® certifications
        • Earn Education PDUs
      • The Open Group
        • Test Center
        • Online exam
    • Learning Delivery Methods
      • Online courses
      • Distant courses
      • In-house courses
      • ONE-to-ONE courses
      • Blended courses
      • Fully tailored courses
    • Exam Glossary
    • Exam Proctor
    • Tutor / Trainer
    • Download
    • Webinar
  • Blog
    • Learn
      • Agile
        • Agile History
        • Manifesto Agile
        • AgilePM
          • About AgilePM
          • Choosing DSDM
      • Design Thinking
        • Background
        • About Design Thinking
        • What is Design Thinking
        • Design Thinking Process
      • Enterprise Architecture
        • About TOGAF® Standard, 10th Edition
        • Structure of TOGAF® Standard, 10th Edition
        • Migration TOGAF® EA certification
      • ISO 27001
        • ISO 27001 Requirements
          • Clause 4
            • Requirements 4.1
            • Requirements 4.2
            • Requirements 4.3
            • Requirements 4.4
          • Clause 5
            • Requirements 5.1
            • Requirements 5.2
            • Requirements 5.3
          • Clause 6
            • Requirements 6.1
            • Requirements 6.2
          • Clause 7
            • Requirements 7.1
            • Requirements 7.2
            • Requirements 7.3
            • Requirements 7.4
            • Requirements 7.5
          • Clause 8
            • Requirements 8.1
            • Requirements 8.2
            • Requirements 8.3
          • Clause 9
            • Requirements 9.1
            • Requirements 9.2
            • Requirements 9.3
          • Clause 10
            • Requirements 10.1
            • Requirements 10.2
      • Lean Six Sigma
        • LSS Define Phase
          • The Basics of Six Sigma
            • Meanings of Six Sigma
            • History of Six Sigma
            • LSS Project Deliverables
            • y= f(x)
            • Voice of Customer
            • Six Sigma Teams
        • LSS Measure Phase
        • LSS Analyze Phase
        • LSS Improve Phase
        • LSS Control Phase
      • Project Management
        • PM2
      • Service Management
        • ISO/IEC 20000
          • ISO20k vs Practices
        • ITIL® 4
          • ITIL® 4 Roles based
          • ITIL® 4 Practices based
          • ITIL® 4 Certification guide
          • ITIL® 4 DITS Practical Assignments
    • News
      • Agile Scrum
      • Design Thinking
      • Enterprise Architecture
      • Examination Institute
      • Information Security
      • Project Management
      • Service Management
  • About Us
    • Why ExamSimul
    • Accreditations
    • Partner Program
    • Corporate Training
      • Training Points
    • Terms of Use
    • Privacy Policy
    • Contact Us

Signup  Login

y= f(x)

  • Home\
  • Blog \
  • Learn\
  • Lean Six Sigma\
  • LSS Define Phase\
  • The Basics of Six Sigma\
  • y= f(x)

Causal theory, in Six Sigma terms, means that you create output (y) from an input (x) and a function (f). Clear as mud so far? Don’t worry.

It’s made up of three components:

  • y: What you get out of a process. In a manufacturing context, this is a physical product.
  • x: What you put into a process. In the same manufacturing context, this is a material or part.
  • f: What you do to turn x into y. In manufacturing, this is a machining or assembly procedure.
y = f(x)
Output = method * input

Using Causal Theory in Six Sigma

When you have a problem with your output (y), causal theory tells you that there are two possible culprits:

  • f: Your procedure for creating that output.
  • x: The materials or information you’re adding to that procedure.

Using Causal Theory with Multi-Step Processes

Very few processes will be simple enough that you can pinpoint either your procedure or material as the issue and voila, solved! So you’ll often need to break down the causal theory equation:

ytotal = y1 + y2 + y3 + ... + yn

Translation: Your total output from a process is the sum of the output from each sub-process within it.

This means that if you have trouble with your output from a complex process, a good starting point is to break down that process into sub-processes. Then, look at the output from each sub-process. Where does the problem creep in? Once you find the problem sub-process, you can move to figuring out whether your input or procedure is the cause.

Correlation and Causation

It’s important to note that sometimes you’ll run into confusion between correlation and causation. You need to understand the difference, and know how to distinguish them.

Correlation: A relationship between two events. They occurred at much the same time, in the same population, or in the same circumstances. For example, spilling a glass of milk and dropping an egg. They might occur at the same time, and they might have the same cause – clumsiness or a fright. But one would rarely cause the other to happen.

Causation: A causative relationship between two events; one caused the other to happen. For example, dropping an egg could cause it to land on the floor. These will also happen at almost the same time, by human observation. But unlike the milk-and-egg example, one – dropping an egg – can be shown to directly cause the other – it landing on the floor.

Separate correlation and causation by identifying variables in your procedure (f) or input (x) and, where possible, change only one variable at a time. When you find that changing a makes a difference to the output but changing b doesn’t, you’ve found that a has a causative effect.

Applying Causal Theory to DMAIC

In a practical sense, here’s how you can use causal theory in your DMAIC cycles:

  • Define: Look at your outputs (y) and clearly distinguish the issue that you’re facing. For example, the end size of a product is not within acceptable levels of consistency.
  • Measure: Measure your inputs (x) and outputs (y). For example, take measurements of product parts at each stage in the process, and check material strength, density and composition.
  • Analyze: Prioritize your outputs (y). Which ones are most contributing to the issue? Test whether issues in your highest-priority sub-processes are caused by the input (x) or the procedures (f). For example, vary material qualities in some tests and the manufacturing sub-procedure in others.
  • Improve: Implement strategies to improve your input (x) or procedures (f) for high-priority sub-processes. Do these alleviate the problem? For example, if substandard materials have caused a lot of the variation, switch suppliers and temporarily check quality rigorously. Then check that the change in materials has improved the end product.
  • Control: Put measures in place to monitor future input (x) and procedures (f). For example, run a weekly spot-check on new inventory of materials.

Using an Input Map with Causal Theory

You can use an input map to show the inputs (x) and outputs (y) of each procedure (f) in your process. We’ll use a simple process that’s familiar to most of us – a morning breakfast routine. You can use a spreadsheet or a mind-map type diagram to give you a visual representation of your mapping.

1. List your procedures

Look at your process and determine the discrete procedures in place. For example, in a morning breakfast routine, you might have:

  • Make a mug of coffee
  • Make toast with jam
  • Read news on tablet
  • Have breakfast
  • Wash breakfast dishes.

Each procedure will be in the middle of its own input map.

Inputs Procedure Outputs
  Make a mug of coffee  
   
   
   
   
  Make toast with jam  
   
   
   
   
  Read news on tablet  
   
   
   
   
  Have breakfast  
   
   
   
   
  Wash breakfast dishes  
   
   
   
   

2. Find your inputs for each procedure

What do you need to complete the procedure? Think about everything that the operator needs to use. For example, ‘make a mug of coffee’ in our breakfast routine might require:

  • Coffee machine
  • Electricity supply
  • Coffee pod
  • Mug
  • Sugar
  • Milk or creamer
  • Spoon
Inputs Procedure Outputs
Coffee machine Make a mug of coffee  
Electricity supply  
Coffee pod  
Mug  
Sugar  
Milk or creamer  
Spoon  
Toaster Make toast with jam  
Electricity supply  
Butter  
Jam  
Knife  
Plate  
Tablet with charged battery Read news on tablet  
News service  
Spectacles  
Coffee in mug Have breakfast  
Toast on plate  
Appetite  
Teeth  
Hot water Wash breakfast dishes  
Dishwashing liquid  
Dirty plate  
Used mug  
Dirty spoon  
Dishcloth  

3. Record your outputs for each procedure

Your outputs are what you get out of each procedure. You have two choices here:

  • List every single output from the procedure
  • List only the output that you’re interested in.

For this example, we’ll only list the output that feeds into other procedures, and the end product.

Inputs Procedure Outputs
Coffee machine Make a mug of coffee Mug of hot coffee, to taste
Electricity supply  
Coffee pod  
Mug  
Sugar  
Milk or creamer  
Spoon  
Toaster Make toast with jam Toast with jam on a plate
Electricity supply  
Butter  
Jam  
Knife  
Plate  
Tablet with charged battery Read news on tablet Entertainment
News service  
Spectacles  
Coffee in mug Have breakfast Dirty dishes
Toast on plate Full stomach
Appetite Feeling of wakefulness
Teeth  
Hot water Wash breakfast dishes Clean plate
Dishwashing liquid Clean mug
Dirty plate Clean spoon
Used mug  
Dirty spoon  
Dishcloth  

4. Link inputs to your output of interest

Next, follow the trail backwards from your problem output to input that might be affecting it.

For example, say I’m finding it hard to stay awake at work this morning. Weird – I had breakfast, which always includes coffee. I can follow my input back from the output and highlight the trail.

Inputs Procedure Outputs
Coffee machine Make a mug of coffee Mug of hot coffee, to taste
Electricity supply  
Coffee pod  
Mug  
Sugar  
Milk or creamer  
Spoon  
Toaster Make toast with jam Toast with jam on a plate
Electricity supply  
Butter  
Jam  
Knife  
Plate  
Tablet with charged battery Read news on tablet Entertainment
News service  
Spectacles  
Coffee in mug Have breakfast Dirty dishes
Toast on plate Full stomach
Appetite Feeling of wakefulness
Teeth  
Hot water Wash breakfast dishes Clean plate
Dishwashing liquid Clean mug
Dirty plate Clean spoon
Used mug  
Dirty spoon  
Dishcloth  

Primary procedure

First, I check my main output. Is my stomach full? Yes. So I must have had breakfast. My memory of this morning agrees. Yes, I had breakfast; toast and coffee. That procedure (f) isn’t the problem.

Primary input

Second, I look at the input (x) for my breakfast procedure. The relevant item is the mug of coffee. If there isn’t a problem with f, causal theory tells me, there must be a problem with x.

Secondary procedure

Third, I look at the making coffee procedure. I remember making and drinking my coffee without issues, so the procedure (f) would seem to be fine. What about the inputs (x)?

Secondary inputs

Fourth, I look at the coffee procedure inputs. If I made the coffee without issues and it was hot when I drank it, that would tend to rule out issues with the coffee machine or electricity. If I didn’t notice any issues with the taste, that would probably rule out problems with the milk or sugar inputs. I can’t imagine any scenario where the choice of mug or spoon would affect my wakefulness later on, so I rule out those inputs for now. What about the coffee pods? They seem the most likely candidate left.

Further investigation

Fifth, I check the coffee pod input in depth. I find the open box of pods – and ta-da! They’re labelled as decaf. I check the rubbish bin to confirm; the pod from this morning is lying on top, and it’s clearly marked as decaf. I’ve found the source of the problem: one of my inputs (coffee pod) was incorrect. This caused a flow-on issue with the output (mug of coffee) from a sub-process, which was the input in the Have breakfast procedure. This incorrect input (mug of decaf coffee) caused an issue with the output of the whole process (feeling of wakefulness).

Conclusion

While the above example is a bit farcical, it does give you a simple example of how using causal theory and an input map can help you to track issues in output back to their causes.

Things to remember

Keep these points in mind:

  • A problem with your output (y) has two potential sources: your input (x) and your procedure (f).
  • These two potential sources are not exclusive. You could have an issue with both your input (x) and your procedure (f).
  • Most processes are complex enough that you’ll need to break them down into multiple sub-processes, each with their own input and procedure.
  • Prioritize your problem outputs. In other words: focus on the larger problems first. You can fine-tune later.
  • Problems in a sub-process can be replicated and enlarged as its output moves through subsequent sub-processes. Ensure that you drill down to the ultimate source of the issue.
  • Learn
    Learn
    • Agile
      Agile
      • Agile History
      • Manifesto Agile
      • AgilePM
        AgilePM
        • About AgilePM
        • Choosing DSDM
    • Design Thinking
      Design Thinking
      • Background
      • About Design Thinking
      • What is Design Thinking
      • Design Thinking Process
    • Enterprise Architecture
      Enterprise Architecture
      • About TOGAF® Standard, 10th Edition
      • Structure of TOGAF® Standard, 10th Edition
      • Migration TOGAF® EA certification
    • ISO 27001
      ISO 27001
      • ISO 27001 Requirements
        ISO 27001 Requirements
        • Clause 4
          Clause 4
          • Requirements 4.1
          • Requirements 4.2
          • Requirements 4.3
          • Requirements 4.4
        • Clause 5
          Clause 5
          • Requirements 5.1
          • Requirements 5.2
          • Requirements 5.3
        • Clause 6
          Clause 6
          • Requirements 6.1
          • Requirements 6.2
        • Clause 7
          Clause 7
          • Requirements 7.1
          • Requirements 7.2
          • Requirements 7.3
          • Requirements 7.4
          • Requirements 7.5
        • Clause 8
          Clause 8
          • Requirements 8.1
          • Requirements 8.2
          • Requirements 8.3
        • Clause 9
          Clause 9
          • Requirements 9.1
          • Requirements 9.2
          • Requirements 9.3
        • Clause 10
          Clause 10
          • Requirements 10.1
          • Requirements 10.2
    • Lean Six Sigma
      Lean Six Sigma
      • LSS Define Phase
        LSS Define Phase
        • The Basics of Six Sigma
          The Basics of Six Sigma
          • Meanings of Six Sigma
          • History of Six Sigma
          • LSS Project Deliverables
          • y= f(x)
          • Voice of Customer
          • Six Sigma Teams
      • LSS Measure Phase
      • LSS Analyze Phase
      • LSS Improve Phase
      • LSS Control Phase
    • Project Management
      Project Management
      • PM2
    • Service Management
      Service Management
      • ISO/IEC 20000
        ISO/IEC 20000
        • ISO20k vs Practices
      • ITIL® 4
        ITIL® 4
        • ITIL® 4 Roles based
        • ITIL® 4 Practices based
        • ITIL® 4 Certification guide
        • ITIL® 4 DITS Practical Assignments
  • News
    News
    • Agile Scrum
    • Design Thinking
    • Enterprise Architecture
    • Examination Institute
    • Information Security
    • Project Management
    • Service Management
AgilePM® Practitioner with exam
AgilePM® Practitioner with exam
830.00‎€
View Details
PM2 Foundation with exam
PM2 Foundation with exam
746.00‎€
View Details
Courseware based on TOGAF® EA Foundation
Courseware based on TOGAF® EA Foundation
875.00‎€
Lean Six Sigma - IASSC® Certified Yellow Belt™ ICYB™ official Mock Exam
Lean Six Sigma - IASSC® Certified Yellow Belt™ ICYB™ official Mock Exam
54.00‎€
View Details

ExamSimul - is the training centre for the BITIL.COM group - an organization of professionals and senior experts whose main interest is the spread of knowledge and the application of methodologies Agile, Scrum, ITIL®, PRINCE2®, CobiT®, TOGAF®, Design Thinking and Standard International. [...]

Latest downloads

Cybersecurity Act
Cyber Resilience Act
Data Governance Act
09 ITIL 4 Master Brochure
ITIL 4 Case Study The Co-operative Group

Quick link

  • Course Catalogue
  • Academy
  • News
  • FAQs
  • Term of Use
  • Privacy Policy
  • Contact

Contact

Where we areEmail: info@examsimul.com
Linkedin: ExamSimul
2025 © Copyright ExamSimul - All Right Reserved
ITIL®, PRINCE2®, PRINCE2 Agile® are Registered Trade Marks of the PeopleCert group. IASSC Lean Six Sigma™ is trademark of the PeopleCert group. Used under licence from PeopleCert. All rights reserved. TOGAF® is a registered trademarks of The Open Group in the United States and other countries. COBIT® 2019 is a Registered Trade Marks of the Information Systems Audit and Control Association and the IT Governance Institute. AgilePM® is a registered trademark of Agile Business Consortium. All rights Reserved. The APMG International Scrum and Swirl Device logo is a trademark of The APM Group Limited, used under permission of The APM Group Limited. All rights reserved. APMG International ISO/IEC 20000™ is a trademark of The APM Group Limited. All rights reserved. APMG International ISO/IEC 27001™ is a trademark of The APM Group Limited. All rights reserved. FitSM® is a registered trademark of ITEMO e.V. DTMethod® is a registered trademark of Inprogress Sp.zo.o.
  • Certifications
    • Agile
    • Agile Scrum
    • Business Continuity
    • CyberSecurity
      • ISO 27001
      • NIST
    • Design Thinking
    • DevOps
    • Enterprise Architecture
    • Governance System
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • Project Management
      • AgilePM
      • PM2
      • PRINCE2
      • PRINCE2 Agile
    • Service Management
      • FitSM
      • ISO 20000
      • ITIL
        • ITIL Foundation
        • ITIL Managing Professional
        • ITIL Strategic Leader
        • ITIL Practitioner
      • OpenSM
    • SW Testing
  • Exams
    • AgilePM®
    • Agile Scrum Product Owner®
    • Agile Scrum Master®
    • Design Thinking®
    • DevOps®
    • DORA Resilience
      • DORA Foundation
    • Enterprise Architecture
      • Exam Simulator for TOGAF® EA Foundation
    • FitSM®
    • ISO 20000
      • ISO 20k Foundation
      • ISO 20k Auditor
    • ISO 22301 Continuity
    • ISO 27001
      • ISO 27001 Foundation
      • ISO 27001 Auditor
      • ISO 27001 Lead Auditor
      • ISO 27701 Foundation
    • ISO 31000 Risk Mgmt
    • IT Governance
    • ITIL®
      • ITIL® Foundation
      • ITIL® Managing Professional
      • ITIL® Strategic Leader
      • ITIL® Practitioner
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • NIS 2 Cybersecurity
      • NIS 2 Foundation
    • NIST Privacy
      • NIST Privacy Foundation
    • OpenSM™
      • OpenSM Foundation
    • PM2®
      • PM2 Foundation
    • PRINCE2®
      • PRINCE2® Foundation
      • PRINCE2® Practitioner
    • PRINCE2® Agile
    • SW Testing
  • Courses
    • AgilePM
      • AgilePM® Foundation
      • AgilePM® Practitioner
    • Agile Scrum
      • Agile Scrum Master
    • Cloud Management
    • Design Thinking
      • DT Method® Foundation
    • DORA Cybersecurity
    • FitSM
      • FitSM Foundation
    • ISO/IEC 20000
      • ISO 20000 Foundation
      • ISO 20000 Auditor
      • ISO 20000 Practitioner
      • ISO 20000 Lead Auditor
    • ISO 22301 Continuity
      • ISO 22301 Foundation
    • ISO/IEC 27000
      • ISO 27001 Foundation
      • ISO 27001 Auditor
      • ISO 27001 Practitioner
      • ISO 27001 Lead Auditor
      • ISO 27032 Foundation
      • ISO 27035 Foundation
    • ISO 31000 Risk Mgmt
      • ISO 31000 Foundation
    • ITIL® 4
      • ITIL® 4 Foundation
      • ITIL® 4 Managing Professional
        • ITIL® 4 CDS
        • ITIL® 4 DSV
        • ITIL® 4 HVIT
        • ITIL® 4 DPI
      • ITIL® 4 Strategic Leader
        • ITIL® 4 DPI
        • ITIL® 4 DITS
      • ITIL® 4 Practitioner
        • ITIL® 4 Monitoring and Event Management
        • ITIL® 4 Incident Management
        • ITIL® 4 Problem Management
        • ITIL® 4 Service Desk
        • ITIL® 4 Service Request Management
    • Lean Six Sigma
      • LSS Yellow Belt
      • LSS Green Belt
      • LSS Black Belt
    • NIS 2 Cybersecurity
    • OpenSM
      • OpenSM Foundation
    • PM2 EU Project
      • PM2® Foundation
    • PRINCE2®
      • PRINCE2® Foundation
      • PRINCE2® Practitioner
    • PRINCE2 Agile®
      • PRINCE2 Agile® Foundation
      • PRINCE2 Agile® Practitioner
    • Privacy
      • ISO 27701 Privacy Foundation
      • NIST Privacy Foundation
    • SW Testing
      • SW Testing Foundation
    • TOGAF®
      • TOGAF® EA Foundation
      • TOGAF® EA Practitioner
  • Resources
    • Academy
    • Examination Institute
      • APMG
      • Axelos
        • CPD Requirements
      • EXIN
      • GoToCertify
      • ISACA
      • PECB
      • Peoplecert
        • How to access eBook
        • How to book an Exam
        • How to renew ITIL certification
      • PMI
        • PDU to maintain PMI® certifications
        • Earn Education PDUs
      • The Open Group
        • Test Center
        • Online exam
    • Learning Delivery Methods
      • Online courses
      • Distant courses
      • In-house courses
      • ONE-to-ONE courses
      • Blended courses
      • Fully tailored courses
    • Exam Glossary
    • Exam Proctor
    • Tutor / Trainer
    • Download
    • Webinar
  • Blog
    • Learn
      • Agile
        • Agile History
        • Manifesto Agile
        • AgilePM
          • About AgilePM
          • Choosing DSDM
      • Design Thinking
        • Background
        • About Design Thinking
        • What is Design Thinking
        • Design Thinking Process
      • Enterprise Architecture
        • About TOGAF® Standard, 10th Edition
        • Structure of TOGAF® Standard, 10th Edition
        • Migration TOGAF® EA certification
      • ISO 27001
        • ISO 27001 Requirements
          • Clause 4
            • Requirements 4.1
            • Requirements 4.2
            • Requirements 4.3
            • Requirements 4.4
          • Clause 5
            • Requirements 5.1
            • Requirements 5.2
            • Requirements 5.3
          • Clause 6
            • Requirements 6.1
            • Requirements 6.2
          • Clause 7
            • Requirements 7.1
            • Requirements 7.2
            • Requirements 7.3
            • Requirements 7.4
            • Requirements 7.5
          • Clause 8
            • Requirements 8.1
            • Requirements 8.2
            • Requirements 8.3
          • Clause 9
            • Requirements 9.1
            • Requirements 9.2
            • Requirements 9.3
          • Clause 10
            • Requirements 10.1
            • Requirements 10.2
      • Lean Six Sigma
        • LSS Define Phase
          • The Basics of Six Sigma
            • Meanings of Six Sigma
            • History of Six Sigma
            • LSS Project Deliverables
            • y= f(x)
            • Voice of Customer
            • Six Sigma Teams
        • LSS Measure Phase
        • LSS Analyze Phase
        • LSS Improve Phase
        • LSS Control Phase
      • Project Management
        • PM2
      • Service Management
        • ISO/IEC 20000
          • ISO20k vs Practices
        • ITIL® 4
          • ITIL® 4 Roles based
          • ITIL® 4 Practices based
          • ITIL® 4 Certification guide
          • ITIL® 4 DITS Practical Assignments
    • News
      • Agile Scrum
      • Design Thinking
      • Enterprise Architecture
      • Examination Institute
      • Information Security
      • Project Management
      • Service Management
  • About Us
    • Why ExamSimul
    • Accreditations
    • Partner Program
    • Corporate Training
      • Training Points
    • Terms of Use
    • Privacy Policy
    • Contact Us
  0  - 0.00‎€
Your shopping cart is empty!
USD EUR GBP
Top

Training Course Catalogue

Training Course Catalogue 

Unlock Your Potential, Transform Your Future!

Rewarding Your Excellence in ITIL 4
Get Free ITIL4 Practitioner Exam Voucher
Course Catalogue Corporate Training Course Calendar Contact Us